Laserfiche WebLink
11 <br />RECEIVED <br />JAN 11 2010 <br />5. SECONDARY PIPE TESTING ENVIROKIMENTA, <br />Test Method Developed By: ❑ Piping Manufacturer ® industry Standard ❑ Pr i'ess ohrWAR17V <br />❑ Other (Spec) <br />Test Method Used: ® Pressure ❑ Vacuum 0 Hvdrostatic <br />0 Other (Spec) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolutions 0.5% of span <br />Piping Run # 87 Piping Run # 91 Piping Run # Diesel Piping Run # 87 Vent <br />Piping Material: <br />Poly <br />Poly <br />Poly <br />Fiberglass <br />Piping Manufacturer: <br />Western Fiberglass <br />Western Fiberglass <br />Western Fiberglass <br />Ameron <br />Piping Diameter: <br />2" <br />2" <br />2" <br />3" <br />Length of Piping Run: <br />100' <br />100' <br />100' <br />80' <br />Product Stored: <br />Gasoline <br />Gasoline <br />Diesel <br />N/A <br />Method and location Of <br />piping -run Isolation: <br />Reducer Boots/Fittings <br />Reducer Roots/Fittings <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />startin test: <br />10 minutes <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />9:30 am <br />9:30 am <br />9:30 am <br />10:30 am <br />Initial Reading (RI): <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />10:30 am <br />10:30 am <br />10:30 am <br />11:30 am <br />Final Reading (RA <br />5 DSI <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1 hr. <br />1 hr. <br />1 hr. <br />I hr. <br />Change in Reading (RF -R:): <br />None <br />None <br />None <br />None <br />Pass/Fail Threshold Or <br />No deteMa6le Loss <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />Criteria: <br />Test Result: 1 ® Pass 0 Fail I © Pass 0 Fail I ® Pass 0 Fail 1 ® Pass U Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up forfailed tests) <br />