Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.si°ov.oro/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT <br />Facility <br />Safeway Fuel #2707 <br />Factlity <br />6425 Pacific Ave., Stockton <br />Inspection <br />Date: Jan 21, 2014 <br />Name: <br />nderess: <br />�o°la Rob Sin h <br />Title: <br />Safety & Envir. Aff. Mgr. <br />Prone: <br />(925) 469-7164 <br />t <br />g <br />Inspection <br />Type: <br />X Routine X Monitoring System <br />Certification i i Installation [] Complaint - [off. [] Other: <br />(Authority HSC 25289) <br />Conserltlor.. Xlnspection XSampling XPhotos <br />Giantedby:Jannes Farris Title: Person -in -charge <br />Monitoring <br />Veeder-Root TLS -350R <br />Piping XPressurized ❑ Suction [] Gravity <br />System: <br />Overfill 1 El Mectrant Xd XAudible/visual <br />Prevention: <br />usr <br />10 <br />11 <br />12 <br />—_Product— <br />87 -octane <br />DSL_____ <br />_ 91octane <br />OOpeator. Maria Guarnelli <br />a 5/11/14 <br />violations: fIM1-Release Detection []M2 -Release Prevention XM3-Both <br />On Site ServiceICC <br />Kris Bell <br />FManufacturer's <br />10/2/14 VR x. 4/5/14 VMI x. 11/19/14 <br />Technician: <br />Date:es. <br />Training: <br />VIOLATIONS <br />#1 <br />C1 <br />C2 <br />M <br />I Code Sect#on <br />HSC = California Heakh and Safety Code; CCR = California Code of Regulabons <br />C1 = Class 1 violation; C2 = Class 2 violation; M = Minor violation <br />File Review <br />101 <br />HSC 25284 <br />No permit to operate <br />102 <br />HSC 25404.5 <br />Annual operating fees not paid <br />103 <br />HSC 25284(a)(3) <br />No written agreement between the person that the operating permit was issued to and the tank operator to <br />monitor the tank system <br />104 <br />HSC 252922 <br />Current financial responsibility documents not on file with the Environmental Health Department (EHD) <br />105 <br />CCR 2711 <br />Current Unified Program Consolidated Forms not on file with the EHD (Facility and tank form) <br />106 <br />CCR 2632(b) <br />Monitoring Program (Monitoring & Response Plans) is not current or approved by the EHD <br />107 <br />CCR 2632(d)(1)(C) <br />Plot plan/site map not submitted or fails to completely show where monitoring is performed <br />108 <br />CCR 2637 <br />Secondary containment: (a) test not performed; (e) test report not submitted within 30 days; (f) test notification <br />not proovided to the EHD at least 48 hours prior to conducting the test <br />Monitoring equipment certification: (a) not performed annually; (d) test report not submitted within 30 days; <br />109 <br />CCR 2638 <br />(e) test notification not provided to the EHD at least 46 hours prior to conducting an installation, repair, <br />relacement, calibration, or certification <br />110 <br />HSC 25291(f) <br />Annual line leak detector test not performed (M7) <br />111 <br />HSC 25284.2 <br />Annual spill containment testing not performed <br />112 <br />CCR 2636(f)(4) <br />Annual line tightness test not performed if positive shutdown or fail safe not present (M1) <br />113 <br />CCR 2715(a) <br />Failed to inform the EHD of a change of designated operator within 30 days <br />114 <br />CCR 2715(b) <br />Designated operator does not possess a current ICC CA UST System Operator certification <br />115 <br />CCR 2660(k) <br />Repair for tank or piping not tested for tightness after completion of the repair pursuant to (M2) <br />permit conditions <br />116 <br />HSC 25292.5 <br />Enhanced leak detection (ELD) testing not performed on a system located within 1000' of public well, or <br />failures not repaired and retested <br />117 <br />CCR 2661 <br />Permit to repair UST system not obtained <br />118HSC <br />25286(a) <br />Operational permit not amended when UST storage and/or monitoring system charged <br />119 <br />HSC 25298(b) <br />Permit to temporarily close UST system not obtained <br />120 <br />HSC 25298(c) <br />Permit to dose UST system not obtained <br />On Site Records <br />Maintenance & monitoring records not maintained 3 years, cathodic protection records for 6''A years, written <br />performance claims pertaining to release detection systems for 5 years, or records of repairs, linings, and <br />201 <br />CCR 2712(b) <br />upgrades for the life of the tank. Monitoring records include: (1) date and time of all monitoring or sampling; <br />(2) monitoring equipment calibration and maintenance records; (3) results of any visual observations; (4) <br />results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other monitoring <br />equipment, ground water elevations, or other test results; 6 results of inventory readings and reconciliations <br />202 <br />X CCR 2712(i) <br />Monitoring plan, response plan, and/or operating permit and all conditions not onsite <br />Unauthorized release that (c) did not escape secondary containment and cleaned up within eight hours (Mt) <br />203 <br />CCR 2650 <br />was not recorded; (e) escaped secondary containment, not cleaned up after eight hours, or a sudden loss of <br />product was not reported to the EHD within 24 hours <br />Stacy Rivera (209)468- . 1� <br />i <br />EHD 23-02 Rev 04/19/12 Page 1 UST INSPECTION REPORT <br />