My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2012 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 5:10:41 PM
Creation date
5/15/2019 2:24:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2018
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
518
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN -30-2013 10:49 Service Station Systems <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />p Other (Specify) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />Piping Run # 87 Piping Run # 91 Piping Run # Diesel Piping Run # 87 Vent <br />Piping Material: <br />Poly <br />poly <br />Poly <br />Fiberglass <br />Piping Manufacturer: <br />Western Fiberglass <br />Western Fiberglass <br />Western Fiberglass <br />Ameron <br />Piping Diameter: <br />2" <br />2" <br />2" <br />3" <br />Length of Piping Run: <br />100' <br />100, <br />100, <br />80, <br />Product Stared: <br />Gasoline <br />Gasoline <br />Diesel <br />N/A <br />Method and location of <br />i i -run isolation: <br />Redneer aoot%ffittinZ <br />Reducer BwtsMtOngs <br />Reducer aont%Titings <br />Reducer l wN/Fitrings <br />Wait time between applying <br />pressurelvacuurn/water and <br />starting test: <br />10 minutes <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />7:45 am <br />7:45 am <br />7:45 am <br />7:45 ata <br />Initial Reading (RD: <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />8:45 ata <br />8:45 am <br />8:45 am <br />8:45 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Tett Duration: <br />1 hr. <br />I hr. <br />1 hr. <br />1 hr. <br />Change in Reading (R�--RO: <br />None <br />None <br />None <br />None <br />Pass&ail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />Test Result: <br />I M Pass Fail <br />IM Pass Fail <br />® Pass Fail <br />El Pass Fail <br />Comments ^ (include information on repairs made prior to testing, and recommended fallow -up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.