Laserfiche WebLink
JAN -30-2013 10:50 Service Station Systems 408 936 8868 P.06 <br />6. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: 0 Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges <br />Piping Run # Piping Run # <br />91 Vent Diesel Vent <br />Equipment Resolution: 0.5% of span <br />Piping Run # <br />Vapar <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Ameron <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />g0' <br />80, <br />100, <br />Product Stored: <br />N/A <br />N/A <br />N/A <br />Method and location of <br />piping -run isolation: <br />Reducer Rm,WMtnttgs <br />Reducer Bootathittings <br />Reducer RrohJFiltings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />9:30 am <br />9:30 am <br />9:30 am <br />Initial Reading (Rr): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />10:30 am <br />10:30 am <br />10:30 am <br />Final Reading (Rr): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />I hr. <br />1 hr. <br />1 hr. <br />Change in Reading (RvR): <br />None <br />None <br />None <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable boss <br />No detectable Loss <br />Test Result: <br />M Pass Fail <br />® Pass Pail <br />I MP"_ Fail <br />CoMments — (include information nn repairs made prior to testing, and recommended follow-up for failed tests) <br />