Laserfiche WebLink
SAN -30-2013 10:50 Service Station Systems <br />7. PIPING SUMP TESTING <br />408 938 8888 P.07 <br />Test Method Developed By; ❑ Sump Manufacturer 0 industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure [I Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon Sump Tester <br />STP Sump 4187 STP Sump # 91 <br />Equipment Resolution: +/- 0.002" <br />STP Sump # Diesel <br />Sump Diameter: <br />42" <br />42" <br />42" <br />Sump Depth: <br />81" <br />$0" <br />80" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />131, <br />14" <br />14" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />34" <br />34" <br />36" <br />Condition of sump prior to testing: <br />Good <br />Good <br />Good <br />Portion of Sump Tested' <br />2" above piping <br />2" above piping <br />2" above piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />❑ Yes C1 No ® NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ONA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?6 <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />[] Yes ❑ No SNA <br />Was fail-safe verified to be <br />operational?' <br />❑ Yes [l No 19 NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ONA <br />Wait time between applying <br />pressore/vacuum/water and starting <br />test: <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />1:44 pm <br />12:34 pm <br />12:13 pm <br />Initial Reading (Ri): <br />6.1919 <br />2.3208 <br />2.3214 <br />Test End Time: <br />1:59 pm <br />12:49 pm <br />12:28 pm <br />Final Reading (Ra): <br />6.1919 <br />2.3205 <br />2.3213 <br />Test Duration: <br />15 min. <br />15 min. <br />15 min. <br />Change in Reading (RF -R,): <br />None <br />0.0003 <br />0.0001 <br />Pass/Fail Threshold or Criteria: <br />+/• 0.002" <br />+/.0.002" <br />+/- 0.002" <br />Test Result: <br />0 Pass Fail <br />M Pass Fail <br />M Pass Fail <br />Was sensor removed for testing? <br />® Ycs ❑ No ❑ NA <br />W Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />19 Yes ❑ No ❑ NA <br />CommentS — (include information on repairs made prior to tetlig, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to = of the questions indicated with an <br />asterisk (■) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />