My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010128
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
757
>
3500 - Local Oversight Program
>
PR0544463
>
ARCHIVED REPORTS XR0010128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:05 AM
Creation date
5/16/2019 8:53:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010128
RECORD_ID
PR0544463
PE
3528
FACILITY_ID
FA0003214
FACILITY_NAME
EASTGATE BUSINESS PARK*
STREET_NUMBER
757
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25026001
CURRENT_STATUS
02
SITE_LOCATION
757 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• At each ORC injection location, a 1-inch rod will be advanced to a <br /> depth of 10 feet below the top of the capillary zone, following standard <br /> Geoprobe procedures <br /> 0 An appropriate quantity of ORC slurry will be mixed for each location <br />' and a high pressure slurry pump will be connected to the 1-inch rod <br /> using a hose <br /> t • While slowly withdrawing the rod from the borehole, a predetermined <br /> amount of slurry will be pumped into the aquifer <br /> l • As each 4-foot section of the drive rod is removed from the borehole it <br /> will be disconnected The hose will then be reconnected to the rod and <br /> the previous bullet will be repeated This procedure will be repeated <br /> until the top of the capillary fringe/smear zone is reached <br /> • Once the top of the capillary fringe/smear zone is reached, a bentonite <br /> seal will be slurried to the top of the borehole The ground surface will <br /> then be restored to its original condition <br /> • The drive rods will be decontaminated and the rig will be moved to <br /> the next injection location <br /> 53 GROLIND WATER MONITORING <br />' Following the injection of ORC, ERM will perform ground water sampling <br /> to monitor hydrocarbon constituents in ground water at each former UST <br /> site Ground water samples will be collected in monitoring wells MW-1 <br /> through MW-6 at the site Consistent with the results of previous <br /> sampling, ground water samples will be analyzed for TPH-g and BTEX <br /> Ground water sampling will be performed according to the following <br /> schedule <br /> • 1 month after ORC injection, and <br /> 0 Every 2 months thereafter, up to 9 months following ORC injection <br />' Depending on the results of the ground water sampling events, the <br /> sampling frequency may be modified as appropriate <br />' If the sampling results indicate that the concentrations of TPH-g and <br /> BTEX are decreasing or show stabilization, Heinz will submit a request for ' <br /> 1 <br />' 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.