My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1419
>
3500 - Local Oversight Program
>
PR0544465
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 11:54:59 AM
Creation date
5/16/2019 11:30:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544465
PE
3528
FACILITY_ID
FA0005837
FACILITY_NAME
STEFANOS GASOLINE*
STREET_NUMBER
1419
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15137016
CURRENT_STATUS
02
SITE_LOCATION
1419 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Vapor Investigation Work Plan <br /> Former STEFANO'S GAS STATION; <br /> 1419;East Charter Way, Stockton, California <br /> 1.0. INTRODUCTION <br /> At the request of Ms. Winifred Ailexander, representing the MaryGardella Trust,Advanced <br /> GeoEnvironmentai, Inc. (AGE)has prepared the enclosed work plan for 1419 East Charter <br /> ment <br /> Way, California. The scope of work includes the advance ;of two soil borings for the <br /> Ih or intrusion at the site. The <br /> collection of soil-vapor samples to assess the potential for vapor <br /> location of the site is illustrated in Figure 1. A plan of the site is illustrated in Figure 2. <br /> The Central Valley Regional Water Quality Control Board (CVRWQCB) and the San <br /> Joaquin County Environmental Health Department (EHD) are requiring,evaluation of the <br /> site for potential vapor intrusion into adjacent buildings north of the site prior to <br /> consideration for low risk closure. Results are evaluated with threshold concentrations <br /> established by the. San Francisco Bay Regional Water Quality Control Board <br /> Environmental Screening Levels (ESLs) and California Human. Health Screening Levels <br /> (CHHSLs). <br /> This work plan has been prepared in accordance with CVRWQCB guidelines for the <br /> investigation of underground storage tanks (UST) sites and in'accordance with an EHD <br /> directive letter, dated 02 February 2012 (Appendix A <br /> 2.0. SCOPE OF WORK <br /> i AGE proposes to collect soil-vapor samples to assess the potential for soil vapor intrusion <br /> l into the buildings adjacent to the site. <br />{ The scope of work for this investigation will consist of the following tasks: <br /> i <br /> • :Permitting and pre-fieldwork preparations; <br />} • Direct push boring advancement and soil-vapor sample:collection; <br /> • Soil-vapor sample analysis; <br /> • Review and analysis of soil-vapor data; and <br /> • Report preparation. <br /> 2.1. PERMITTING AND PRE-FIELD WORK PREPARATIONS <br /> I _ <br /> A site specific health and safety plan will be prepared in accordance with Occupational <br /> Advanced Geo Environmental,Inc. <br /> i <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.