My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1501
>
3500 - Local Oversight Program
>
PR0508175
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 2:22:05 PM
Creation date
5/16/2019 1:53:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508175
PE
2950
FACILITY_ID
FA0007977
FACILITY_NAME
WOOLSEY OIL CARDLOCK
STREET_NUMBER
1501
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337016
CURRENT_STATUS
02
SITE_LOCATION
1501 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j <br /> Woolsey Oil, Inc. 2- May 17, 1999 <br /> ! 1. help the responsible party undertake-the-necessary corrective action..in a cost-effective, efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was.performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required b <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. _ <br /> i <br /> In some limited situations interim cleanup will be necessary to mitigate.a demonstrated'immediate <br /> hazard to public health, or the environment. Program.regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action,.and; (2) �p <br /> "complying with any requirements That the regulatory agency may set. Interim mediad action should <br /> only be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a..CAP and an evaluation of the most cost- <br />! effective corrective action alternative. <br /> Three bids and Cost Preapproval- Only corrective action costs required <br /> _ ed by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> i with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> i all future corrective action work. If you do not obtain three bids and cost preapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> If you have any questions,please contact me at(916)-227-4411. <br /> Sincerely, <br /> f <br /> Sandy Gill <br /> 4 wClaims Review Unit <br /> `Underground Storage Tank-Cleanup Fund = =--- - - �-- <br /> cc: Mr. Gordon Boggs <br /> -Ms. Margaret Lagono <br /> RWQCB, Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O.,Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> t <br /> California Environmental ProtectionAgency <br /> �a RecIrcled Paper . <br />
The URL can be used to link to this page
Your browser does not support the video tag.