My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1521
>
3500 - Local Oversight Program
>
PR0544466
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:38:58 PM
Creation date
5/16/2019 2:51:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544466
PE
3528
FACILITY_ID
FA0005303
FACILITY_NAME
HOLT OF CALIFORNIA
STREET_NUMBER
1521
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337015
CURRENT_STATUS
02
SITE_LOCATION
1521 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geologic soils logs siyned. by the Registered Geologist or <br /> certified Engineering Geolo <br /> 9 " g gist ( State .of California Registration) . <br /> All soils shall be described according to the "Unified Soil <br /> f Classification System" , with' detailediltextural descriptions, in- <br /> eluding; estimates percentagesof gravel, sand and fines (< 200 <br /> sieve) ; color; moisture conditions; degree of plasticity; <br /> dilatancy; cementation _an(] reaction to HCL: odor; soil structure; <br /> and the soil- symbol <br /> l <br /> Upon completion or review of ' the Site' Assessment Report, a response <br /> to the property owner will be initiated by ,�the .San Joaquin Local Health <br /> District, to suggest modifications as needed or to encourage a meeting <br /> :with the responsible party( ies ) and consultant( s ) . <br /> Following the meeting, a summarizing letter .is to be sent to the I <br /> property owner which includes details of the procedure( s ) agreed upon. <br /> The consultant can then 'prepare the Final Remedial' Pl.an for approval . I4 <br /> The plan should contain at least the following: <br /> 3. FINAL REMEDIAL PLAN <br /> Plan details for implementation. <br /> Site -Plan with proposed work areas -defined., j <br /> Implementation schedule For beginning ;work and continuation. <br /> - I <br /> Results of preliminary field tests or! pilot studies <br /> during start up. I <br /> Continued submission of field tests and laboratory results as <br /> required to adequately .monitor clean up activities . <br /> - i <br /> 1 <br /> - i <br /> i <br /> UGT 46 .Pg . 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.