My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1805
>
2900 - Site Mitigation Program
>
PR0544467
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:17:17 PM
Creation date
5/16/2019 4:09:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544467
PE
2959
FACILITY_ID
FA0009741
FACILITY_NAME
EL DORADO CHEMICAL CO INC
STREET_NUMBER
1805
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15514007
CURRENT_STATUS
02
SITE_LOCATION
1805 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> B) ECC shall establish criteria for determining the <br /> extent of decontamination necessary to satisfy the <br /> closure performance standard of Code of Federal <br /> Regulations, Title 40, Section 265. 111. <br /> C) ECC shall submit details of the procedures to be <br /> used to decontaminate field equipment and machinery <br /> including procedures for containment and disposal of <br /> the removed contamination. (265. 112 (b) (4) ) <br /> D) ECC shall submit revised closure cost estimates to <br /> include any additional work or analytical costs <br /> resulting from these modifications. The revised <br /> closure cost estimate shall include estimates of <br /> units and unit costs for each item listed. <br /> (265. 142) <br /> E) ECC shall submit an estimate of the volume of each <br /> type of waste and details on handling and disposal <br /> procedures including the anticipated treatment/ <br /> disposal facility and the approximate distance to <br /> the treatment/disposal facility. (265 . 111 (b) (3) ) <br /> F) ECC shall submit additional information on <br /> procedures for storing excavated waste materials. <br /> This information shall include procedures to prevent <br /> contact with uncontaminated soil, wind dispersal, <br /> and rain water run on and run off. (265. 112 (b) (3) ) <br /> G) ECC shall submit information on the schedule or <br /> estimate of the number of periodic inspections by <br /> the certifying engineer anticipated during closure. <br /> (265. 115) <br /> H) ECC shall submit a topographic map showing the <br /> facility and surrounding area. (265. 112 (b) ) <br /> I) ECC shall specify the type of equipment to be used <br /> to excavate and transport the tank, pipeline, and <br /> contaminated soil . (265. 112 (b) (3) ) <br /> J) ECC shall describe, if known, anticipated future use <br /> of the area affected by the closure. (265. 111) <br /> 2 . ECC shall comply with the following conditions: <br /> A) Overburden from the pipe removal down to 6" above <br /> the pipe shall be placed in a separate storage pile. <br /> This material may be used for backfill if <br /> suitability is demonstrated through sampling and <br /> analysis. (265. 111) <br />
The URL can be used to link to this page
Your browser does not support the video tag.