My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1821
>
2900 - Site Mitigation Program
>
PR0009048
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 4:41:16 PM
Creation date
5/16/2019 4:32:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009048
PE
2960
FACILITY_ID
FA0004083
FACILITY_NAME
CCJS (LEASED PROPERTY)
STREET_NUMBER
1821
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95208
APN
15514015
CURRENT_STATUS
01
SITE_LOCATION
1821 E CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope: <br /> The vast majority of the bores will be north of Building 11 [Fig. 2, attached]. We expect to use <br /> the Geoprobe 66 and 77 series track rig for drilling. Precision Sampling of Oakland will be the <br /> driller. <br /> After sample cores are obtained, they will be chilled on ice and shipped to a state certified lab <br /> for analyses. The bore will be backfilled with hydrated bentonite and resurfaced. The bores are <br /> not expected to reach local ground waters. But, if any perched water or ground water is <br /> reached, we may sample some of the waters. <br /> Additional Assumptions: <br /> 1. Fieldwork will take around 3 to 5 working days. <br /> 2. Drums for waste storage are provided at and will be store temporarily on SITE until <br /> disposal. <br /> 3. Tenants shall be kept at safe distance at the time of fieldwork. <br /> 4. Drilling contractor shall be a full-service major drilling contractor, with on-staff health and <br /> safety officer. <br /> Work schedule: <br /> 1. Starting date: to be scheduled as soon as possible after signing the contract (tentatively <br /> 6/236/27/2008). <br /> 2. Lab results and report: about 2 calendar weeks after last day of the fieldwork. <br /> We appreciate very much this opportunity to be of help on this project, and please feel free to <br /> call if you have any questions. Tel 949-509-9123, ask for me or Susan. <br /> Sincerely, <br /> Gr0z0 <br /> 5 <br /> J w0� ON <br /> CHH <br /> ��L+�•� • No..5724 5724 <br /> S� �Q <br /> �OF C AUFO <br /> Dr. Chris Huang <br /> Registered Professional Geologist, State of California <br /> Environmental,Engineering, &Real Estate Transaction Consultants <br /> Charter-SJCounty-Workplan06-2008 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.