My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:14:40 PM
Creation date
5/17/2019 2:01:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meeting, Geweke Site • - 2 - • 7 June 1994 <br /> 16 South Cherokee Lane, Lodi <br /> We also discussed your intent to proceed with full scale bioremediation. If you choose to do so, the <br /> report must also contain the following: <br /> 1. An estimate of the zone of influence of ground water inoculation; <br /> 2. An estimate of the time to complete bioremediation at the site; <br /> 3. A method for determining the zones of influence of the entire system for soil and ground <br /> water; and <br /> 4. A contingency plan for implementing other remediation procedures in the event the <br /> bioremediation system fails to show significant cleanup of soil and ground water. <br /> Regardless of the method of remediation that is implemented, the ground water plume must be <br /> controlled. A ground water pump and treat system must be installed in the event the plume has <br /> moved beyond the downgradient monitoring wells. Before installing a pump and treat system, a <br /> 24-hour (minimum) aquifer test must be conducted. By 17 June 1994, submit a proposal to <br /> complete the aquifer test by 15 July 1994. <br /> Also, if you intend to proceed with full scale bioremediation, it will be necessary to modify the <br /> Monitoring and Reporting Program included in the Cleanup and Abatement Order to include analyses <br /> for bacteria and their byproducts. Bacterial analysis of soil and ground water samples including <br /> identification of species to determine their presence in soil and ground water would be required. <br /> If you have any questions, please call me at (916) 255-3133. <br /> ELI BETH A. THAYER � <br /> Ass iate Engineer <br /> Enclosures <br /> cc: Ms. Diane Hinson, San Joaquin County Environmental Health Division <br /> Mr. Harlin Knoll, San Joaquin County Environmental Health Division <br /> Mr. James DeMera, Mullen, Sullivan & Newton, Lodi <br /> Mr. Robert Marty, Geological Audit Services, Inc., Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.