Laserfiche WebLink
Geweke Land Development and arketing - 2 - • 29 October 2003 <br /> 16 South Cherokee Lane, Lodi <br /> alternate pilot study proposal, for example, a low flow pump and treat system, should be substituted. I request a <br /> workplan for the proposed pilot study,which addresses my modifications for a bench scale study,by <br /> 30 November 2003. You may combine this workplan with the monitoring well workplan requested in <br /> comment 1. <br /> 3)One perimeter offsite well (MW-11),which began reporting 1,2-DCA in groundwater during 2002, is being <br /> monitored annually. You are to resume quarterly monitoring at MW-11 for 1,2-DCA,but may continue annual <br /> monitoring for all other constituents. <br /> Failure to comply with these requirements and/or CAO No. 93-701 may result in fines and/or denial of State <br /> Cleanup Fund eligibility. <br /> If you have any questions please contact me at(916) 255-3115 or bartoni(a,rb5s.swrcb.ca.eov. <br /> (lames L.Barton,R.G. <br /> Engineering Geologist <br /> cc: Mr. Harlin Knoll, San Joaquin County Environmental Health Division, Stockton <br /> Mr.Brian Millman,Advanced GeoEnvironmental,Incorporated, Stockton <br /> ,/J M <br /> / �n .�H f1I/�n/YYIONV <br /> �E u roly <br />