Laserfiche WebLink
Monitoring Well Parameter Log <br /> Project Name: Geweke Car Capitol Project No.: 4001-001 <br /> Project Location: 16 S. Cherokee Ln.,_Lodi, CA Date: June 30, 1993 <br />' Monitoring Well No.: MW-11 Depth To Water: 57.62' <br /> Well Depth: 72.30' - (DTW) 57.62' x 0.16 = Well Volume: 2.3 oal. <br />' Amount Purged: 5 gal. _ Sample Time: 1613 <br />' Time Temperature Conductivity pH <br /> x 100 wmhos <br />' 1603 74.7 12.04 7.46 <br /> 1606 70.3 11.16 7.40 <br />' 1608 68.6 10.98 7.31 <br /> 1609 68.4 10.95 7.26 <br />' 1610 68.2 10.94 7.24 <br />