Laserfiche WebLink
1 <br /> Monitoring Well Parameter Log <br /> Project Name: Geweke Car Cal2itol Project No.: 4001-001 <br /> Project Location: 16 S. Cherokee Ln., Lodi, CA Date: June 30, 1993 <br /> Monitoring Well No.: MW-12 Depth To Water: 58.44' <br /> Well Depth: 73.62' - (DTW) 58.44' x 0.16 Well Volume: 2.4 Taal. <br />' Amount Purged: 5 gal._ _ Sample Time: 1543 <br />' Time Temperature Conductivity H <br /> P t71 P <br /> x 100 pmhos <br />' 1534 78.2 9.82 7.57 <br /> 1536 72.7 9.24 7.56 <br /> 1538 70.3 8.97 7.48 <br /> 1540 70.0 8.98 7.38 <br />' 1541 69.6 8.93 7.37 <br /> 1 <br /> 1 <br />