Laserfiche WebLink
Monitoring Well Parameter Log <br /> Project Name: Geweke Car Capitol Project No.: 4001-001 <br /> Project Location: 16 S. Cherokee Ln., Lodi. CA _ Date: June 30. 1993 <br /> Monitoring Well No.: MW-13 Depth To Water: 58.86' <br /> Well Depth: 71.40' - (DTW) 58.86' x 0.16 - Well Volume: 2.0 gal. <br />' Amount Purged: 5 aal. Sample Time: 1753 <br />' Time Temperature Conductivity pH <br /> x 100 pmhos <br />' 1744 76.3 11.91 7.76 <br /> 1746 74.4 11.32 7.66 <br />' 1747 72.7 10.94 7.53 <br /> 1749 72.1 10.92 7.49 <br />' 1751 72.0 10.90 7.50 <br /> 1 <br /> 1 <br />