Laserfiche WebLink
} <br /> 1 <br /> Monitoring Well Parameter Log <br /> Project Name: Geweke Car Capitol Project No.: 4001-001 <br /> Project Location: 16 S. Cherokee Ln., Lodi CA Date: ,dune 30. 1993 <br />' Monitoring Well No.: EW-1 Depth To Water: 57.70' <br /> Well Depth: 72.30' - (DTW) 57.70' x 1.47 = Well Volume: 21.46 Gaal. <br />' Amount Purged: 40 cal. Sample Time: 1310 <br /> 1 <br /> Time Temperature Conductivity pH <br /> x 100 pmhos <br />' 1248 79.6 12.46 9.05 <br /> 1250 75.8 6.42 8.53 <br />' 1254 73.2 6.35 8.09 <br /> 1256 72.7 5.93 8.09 <br />' 1300 72.6 4.62 8.18 <br /> 1304 72.6 4.49 8.15 <br /> I <br /> 1 <br /> i <br /> 1 <br /> i <br />