My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
200
>
3500 - Local Oversight Program
>
PR0544476
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:59:04 PM
Creation date
5/17/2019 3:37:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544476
PE
3528
FACILITY_ID
FA0007904
FACILITY_NAME
HENRY HANSEN PROPERTY
STREET_NUMBER
200
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
200 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4-07-200 11103AM FROM MUIR/WZI/WOO©BRIDGE 239 369 9358 <br /> 7 <br /> 2. Submit a Quarterly Status Report for the period ending March 31, 2000 to PHSEHD that <br /> will outline what immediate steps will be conducted at the site in the next quarter(April l <br /> to June 30,2000). We will do this for you if you wish. <br /> 3. Prepare and submit an application to the FUND t initiate a claim for cleanup cost <br /> reimbursement. We will assist you with this if you wish. <br /> 4. Prepare and solicit an Invitation For Bids (IFB) based upon the PHSEHD approved <br /> workplan that WZI Inc. prepared last year. Bid packages will be assembled and quotes <br /> will be obtained from at least three qualified contractors and consultants. From these bids <br /> you will select a winning bidder to.do the work. All of this should take between 4 and 6 <br /> weeks to accomplish. We will help you with this if you wish. <br /> 5. Initiate work with the selected bidding contractor1consultarit. The initial work is <br /> suggested to include Task 1 and portions of Task 2 of the approved workplan. <br /> Approximately 4 soil borings will be drilled to a depth of about 30 feet below ground <br /> surface and soil samples collected. A select number of soil samples will be submitted to <br /> the analytical laboratory for analysis. A short letter summary report of the findings will <br /> be submitted to PHSEHD. <br /> We recommend that you report to PHSEHD that you will complete the application to the <br /> FUND, complete the bidding process, and select a consultant within the next 45 days. <br /> We also recommend that you advise PHSEHD tf.at you will have drilled the soil borings <br /> in Task 2 and have the findings submitted to their agency included in the next Quarterly <br /> Status Report for the period ending June 30, 200 . A due date of the QSR will be no later <br /> than July 15, 2000. <br /> I will agree to help you with these suggested actions on immediate basis. Please advise me <br /> what actions you wish me to conduct. I can be reached at(209) 369-9421. Thank you very <br /> much. <br /> Sincerely, <br /> Stephen G. Muir <br /> Certified Engineering Geologist#1224 <br /> cc: Mr. Michael Infurna,PHSEHD <br /> G: wpfiles\ian.%en\Hansen.002 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.