Laserfiche WebLink
SS SPCC Ran(811-19)DRAFT <br /> Stockton Steel Page 11 <br /> APPENDIX A <br /> Oil Inventory with Planned Response <br /> (§1116(al(a)t3)G)&1117(b<)) <br /> Pre leteble Spill and Planned Response <br /> Capacity Dwa Volvne Rate Direction Prevention Method andlor Planned Spill <br /> ContainerlD Icaars Contents glasshouse of Pailure foalnr offlav Res ons. <br /> Aboveground Storage Tanks(includes piping) <br /> AST-001 10,000 Diesel fuel 1991 Tank wall failure 10," 50 NA Prevention-100%containment(Double <br /> walla l tank).Reg-Contact spill <br /> response contractor to remove fuel from <br /> containment. <br /> Tank overfill, 120 So North, Prevention-Documented procedure fa <br /> spit a hose leak GPM toward tankfillingandfue'transfer.Reg- <br /> during delivery Sam drain Apply storm drain cover.Apply granular <br /> or falaifl fusing absorbent or booms to block flow.Collect <br /> in 55 gallon steel drums. <br /> AST-002and 100 ASi Motor 61 1994 Tank wall faiure 100 50 NA Prevenflon-100%connOrment(both <br /> AST-0 AST-003 (Dimpinment) tanks are positioned over a 375-gallon <br /> Hydraulic 61 gaRanized stock tank).Reg-Pump <br /> al loused oil drum or contact spill <br /> response contractor. <br /> Tank ovafll 10 10 NA Provention-Delivery operator manually <br /> (Callaieera) adds dl win a delivery hose.DN ivery <br /> di operates the delivery nozzle at all <br /> limes.Al.,there is 100%containment. <br /> Reg-Pump oil to used oil drum or <br /> collect with absorbents and place in oll <br /> absorbents drum.Hold fa disposal. <br /> Urea rgaM Storagis Tense, <br /> None <br />