Laserfiche WebLink
SPILL PREVENTION, CONTROL, & COUNTERMEASURE (SPCC) PLAN <br />TRACY TOYOTA <br />PART A: GENERAL INFORMATION <br />t. Name of Facility: <br />2. Type of Facility: <br />3. Initial Date of Facility Operation: <br />4. Location of Facility: <br />5. Name & Address of Owner/Operator: <br />6. Person Responsible for Plan Management: <br />7. Spill/Release Response Plan: <br />8. Periodic Review <br />Tracy Toyota <br />Automobile Dealership <br />June 2000 <br />2895 Naglee Road <br />Tracy, CA 95376 <br />Mr. Keena Turner <br />Tracy Toyota <br />2895 Naglee Road <br />Tracy, CA 95376 <br />Dealership Service Manager <br />See Attachment (C) <br />This SPCC Plan has been prepared to conform with the requirements of the applicable Federal regulation, 40 <br />CFR 112. To ensure it remains current, it will be reviewed and evaluated at least once every five years. Within <br />six months of the review, it will be amended to include more effective prevention and control technology if the <br />technology is field proven and will significantly reduce the likelihood of an oil spill event. This plan will also <br />be amended within six months whenever there is a change in facility design, construction, operation, or <br />maintenance that materially affects the facility's potential for the discharge of oil. All amendments will be <br />certified by a Professional Engineer in accordance with 40 CFR, Part 112.3(d). <br />9. Management Approval <br />The management of this facility shall implement this SPCC Plan as herein described. <br />Signature: <br />Name: <br />to. Certification <br />Title: <br />Date: <br />I hereby certify that I have, or my agent has, visited the facility and that I have examined this plan. Being <br />familiar with the provisions of 40 CFR, Part 112, I attest that it has been prepared in accordance with good <br />engineering practices, including applicable industry standards and procedures for inspection and testing. I <br />consider the plan adequate for the facility. <br />(seal) <br />Signature of Registered Professional Engineer <br />Printed Name Date <br />Tracy Toyota SPCC Plan <br />12-07 <br />