My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAGLEE
>
2895
>
2200 - Hazardous Waste Program
>
PR0517823
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 10:50:51 AM
Creation date
5/20/2019 9:20:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517823
PE
2229
FACILITY_ID
FA0013604
FACILITY_NAME
TRACY TOYOTA
STREET_NUMBER
2895
Direction
N
STREET_NAME
NAGLEE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21229004
CURRENT_STATUS
01
SITE_LOCATION
2895 N NAGLEE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL PREVENTION, CONTROL, & COUNTERMEASURE (SPCC) PLAN <br />TRACY TOYOTA <br />PART A: GENERAL INFORMATION <br />t. Name of Facility: <br />2. Type of Facility: <br />3. Initial Date of Facility Operation: <br />4. Location of Facility: <br />5. Name & Address of Owner/Operator: <br />6. Person Responsible for Plan Management: <br />7. Spill/Release Response Plan: <br />8. Periodic Review <br />Tracy Toyota <br />Automobile Dealership <br />June 2000 <br />2895 Naglee Road <br />Tracy, CA 95376 <br />Mr. Keena Turner <br />Tracy Toyota <br />2895 Naglee Road <br />Tracy, CA 95376 <br />Dealership Service Manager <br />See Attachment (C) <br />This SPCC Plan has been prepared to conform with the requirements of the applicable Federal regulation, 40 <br />CFR 112. To ensure it remains current, it will be reviewed and evaluated at least once every five years. Within <br />six months of the review, it will be amended to include more effective prevention and control technology if the <br />technology is field proven and will significantly reduce the likelihood of an oil spill event. This plan will also <br />be amended within six months whenever there is a change in facility design, construction, operation, or <br />maintenance that materially affects the facility's potential for the discharge of oil. All amendments will be <br />certified by a Professional Engineer in accordance with 40 CFR, Part 112.3(d). <br />9. Management Approval <br />The management of this facility shall implement this SPCC Plan as herein described. <br />Signature: <br />Name: <br />to. Certification <br />Title: <br />Date: <br />I hereby certify that I have, or my agent has, visited the facility and that I have examined this plan. Being <br />familiar with the provisions of 40 CFR, Part 112, I attest that it has been prepared in accordance with good <br />engineering practices, including applicable industry standards and procedures for inspection and testing. I <br />consider the plan adequate for the facility. <br />(seal) <br />Signature of Registered Professional Engineer <br />Printed Name Date <br />Tracy Toyota SPCC Plan <br />12-07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.