My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAGLEE
>
2895
>
2200 - Hazardous Waste Program
>
PR0517823
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 10:50:51 AM
Creation date
5/20/2019 9:20:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517823
PE
2229
FACILITY_ID
FA0013604
FACILITY_NAME
TRACY TOYOTA
STREET_NUMBER
2895
Direction
N
STREET_NAME
NAGLEE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21229004
CURRENT_STATUS
01
SITE_LOCATION
2895 N NAGLEE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART B: SPILL PREVENTION, CONTROL, & COUNTERMEASURES <br />1. Responsible Person <br />The dealership's Service Director is responsible for oil spill prevention, control, and countermeasure <br />activities. <br />2. Potential Spills of Oil—Prediction and Control <br />Note: A facility map illustrating the location of each listed tank/container is included as <br />Attachment (A). <br />No. <br />Source <br />Probable Type <br />Quantity <br />Maximum <br />Flow Rate <br />Probable Direction of Flow <br />Secondary Containment <br />Description <br />of Failure <br />(gallons) <br />(Gals/hour) <br />Aboveground used oil <br />Small leak or <br />Immediate <br />Southeast towards storm drain <br />1 <br />storage tank located <br />complete <br />600 <br />total <br />approximately 150 feet from the oil <br />Double wall steel tank <br />in Quick Lube Oil <br />rupture <br />gallons <br />release <br />room door. <br />Room <br />Aboveground new oil <br />storage tank located <br />Small leak or <br />500 <br />Immediate <br />Southeast towards storm drain <br />Double wall steel tank <br />2 <br />complete <br />total <br />approximately 150 feet from the oil <br />inside Quick Lube Oil <br />rupture <br />gallons <br />release <br />room door. <br />Room <br />Aboveground new oil <br />Small leak or <br />500 <br />Immediate <br />Southeast towards storm drain <br />3 <br />storage tank located <br />complete <br />total <br />approximately 150 feet from the oil <br />Double wall Steel Tank <br />inside Quick Lube Oil <br />rupture <br />gallons <br />release <br />room door. <br />Room <br />Aboveground new oil <br />Small leak or <br />Immediate <br />Southeast towards storm drain <br />4 <br />storage tank located <br />complete <br />250 <br />total <br />approximately 150 feet from the oil <br />Double wall Steel Tank <br />inside Quick Lube Oil <br />rupture <br />gallons <br />release <br />room door. <br />Room <br />Aboveground new oil <br />Small leak or <br />Immediate <br />Southeast towards storm drain <br />5 <br />storage tank located <br />complete <br />250 <br />total <br />approximately 150 feet from the oil <br />Double wall Steel Tank <br />inside Quick Lube Oil <br />rupture <br />gallons <br />release <br />room door. <br />Room <br />Aboveground gear oil <br />Small leak or <br />85 <br />Immediate <br />Southeast towards storm drain <br />6 <br />storage tank located <br />complete <br />total <br />approximately 150 feet from the oil <br />Double wall steel tank <br />in Quick Lube Oil <br />rupture <br />gallons <br />release <br />room door. <br />Room <br />Single wall steel tank <br />(Secondary containment <br />Aboveground gear oil <br />Small leak or <br />Immediate <br />South into the parking lot where <br />tubs which hold 110% of <br />7 <br />storage tank located <br />complete <br />85 <br />total <br />pooling would occur, then to a storm <br />tank capacity to be <br />corner of <br />main <br />rupture <br />gallons <br />release <br />drain. <br />purchased in the next 90 <br />main Service building <br />days) <br />Tracy Toyota SPCC Plan <br />12-07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.