My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:20:04 PM
Creation date
5/20/2019 9:20:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC H?ALTH SERVI(ItS <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION ,. <br /> Karen Furst, M.D., M.P.H., Health Officer .._ P <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> PAUL SUPPLE <br /> ARCO PRODUCTS COMPANY <br /> P 0 BOX 6549 <br /> MORAGA CA 94570 <br /> RE: ARCO# 6100 <br /> 25775 Patterson Pass <br /> Tracy,CA <br /> WORKPLAN: Wor splan for an Additional Subsurface Investigation DATED: 5/22/01 <br /> PREPARED BY: Delta Environmental Consultants,Inc. <br /> APPROVED X Discussed with Central Valley Regional Water Quality Control Board <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN(1-1&S 25299.37,subd.(c)(3).): <br /> 1. Advancement of four on site borings to depths of 120 to 140 feet below ground surface(bgs)with <br /> continuous soil sampling using mud rotary drilling and conductance of wireline geophysical logging within <br /> the four borings. <br /> 2. Laboratory analysis of soil and water samples for total petroleum hydrocarbons,BTEX,methanol,MTBE <br /> ETBE,TAME,TBA,DIPE, 1,2 DCA,ethanol and EDB. <br /> 3. Installation of four on site monitoring wells using air-rotary drilling. <br /> 4. Advancement of two on site borings to a depth of 100 feet bgs using hollow stem auger drilling. <br /> 5. Develop,sample,and survey the new wells. <br /> COMMENTS AND CONDITIONS: <br /> 1. Completion of the off site borings and installation of the off site wells should be contingent on the <br /> information from the on site work Please continue efforts to secure the off site access agreement. <br /> Information from the on site work may provide further evidence that the off site work is required. <br /> 2. Obtain well permit(s)from EHD and notify EHD at least 48 hours prior to the proposed scheduled work <br /> dates. <br /> REASONS FORDISAPPROVAL OF THE WORKPLAN(II&S 25299.37,subd.(Q(3).): <br /> DATED <br /> c: CVRWQCB—Marty Hartzell <br /> Delta Environmental Consultants <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.