Laserfiche WebLink
Vierra Family LTD Project No. D000-340 <br /> March 30,2001 <br /> Page 2 <br /> Delta anticipates the work will be completed in approximately two weeks. Three <br /> subcontractor personnel will operate the drill rig, and a geologist from Delta will be <br /> present during drilling. Every effort will be made to keep the work area clean and to <br /> restore the area to the original condition when the work is completed. We will contact you <br /> to coordinate drilling operations and to determine an appropriate time to initiate the <br /> fieldwork. If the soil borings are converted to groundwater monitoring wells, periodic <br /> access will be necessary to monitor and sample the wells. Our tentative schedule for the <br /> drilling of the soil borings is May 2001. Upon receipt of your authorization, we will <br /> schedule a date for our work and we will inform you of that date. <br /> We appreciate your cooperation in this matter. Please sign and return both copies of the <br /> License Agreement form to our office. We will forward both copies to ARCO. ARCO <br /> will then sign both copies and one copy will be returned to you for your files. Upon your <br /> authorization to access your property, we will arrange a time to perform the work and <br /> apprise you of the schedule. <br /> Please contact me at (530) 676-6000 if you have any questions regarding this matter. <br /> Sincerely, <br /> WJoson, <br /> NMENTAL CONSULTANTS, INC. <br /> Project Manager <br /> cc: Ms. Margaret Lagorio, San Joaquin County Public Health Services Environmental <br /> Health Division <br /> Attachments: License Agreement(two copies) <br /> Proposed Boring Locations Map <br /> C AARCO\6100\CORRES\6100-AuthTolnstall.do <br />