Laserfiche WebLink
Mr.Nuel Henderson,P.G., SJCEHD September 21,2005 <br /> ARCO Station 6100,Tracy,California Project No.U6100-15-1 <br /> Additional Site Assessment Work Plan <br /> Page 12 <br /> If you have any questions regarding this work plan, please contact Jay Johnson at <br /> (530) 676-6000. <br /> Sincerely, <br /> STRATUS ENVIRONMENTAL, INC. <br /> 45 0 15gtv�� <br /> Scott G. Bittinger, P.G. ;ay <br /> Project Geologist <br /> Attachments: Table 1 Summary of Soil Borings <br /> Table 2 Summary of Wells <br /> Table 3 Groundwater Level Data <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Geologic Cross Section A to A' <br /> Figure 4 Geologic Cross Section B to B' <br /> Figure 5 Geologic Cross Section C to C' <br /> Figure 6 Groundwater Elevation Contour Map, <br /> Deeper Screened Wells, 2nd Quarter 2005 <br /> Figure 7 Groundwater Analytical Summary, 2"d Quarter 2005 <br /> Appendix A Field Practices and Procedures <br /> cc: Mr. Jim Barton, CRWQCB <br /> Mr. Paul Supple, Atlantic Richfield Company <br /> Mr. Vernon Elarth,URS Corporation Americas <br /> The Robert and Cleo Vieira Family Trust <br /> KABp-Arco for URS\6100\Work P1ans\arco6100-workp1an 09.2005.doc <br />