Laserfiche WebLink
m NORN <br /> 01 IVINN. <br /> _ f <br />.1.r <br /> 7 <br /> J <br /> J <br /> Addendum to Work Plan June 13, 1991 <br /> AGS 38048-6W <br /> ARCO Station No. 760, Lodi, California <br /> o Monitor backfilling of stockpiled backfill material removed from the old <br /> tank cavity back into the old tank cavity, provided authorization is obtained <br /> from SJCPH9. Authorization aleso collected lfromCPHS l be based on the analytical <br /> the backfill material. <br /> results of the comp P <br /> o Prepare a report summarizing our methods, interpretations, and <br /> conclusions. <br /> ARCO will arrange transportation of stockpiled soil from the new tank cavity to an <br /> appropriate facility for disposal. The work will be performed in accordance with the Tri- <br /> i Regional Board Staff Recommendations for Preliminary Evaluation and Investigation of <br /> Underground Tank Sites (California Regional Water Quality Control Board, Central <br /> € Valley Region, 1989);Appendix A to that document (August 1990); and the Leaking <br /> s Underground Fuel Tank Manual (California Leaking Underground Fuel Tank Task <br /> Force, 1989). <br /> We recommend that a copy of this addendum be forwarded to Ms. Diane Hinson of the <br /> San Joaquin County Public Health Services. Environmental Health Division, 445 North <br /> San Joaquin, Stockton, California 95202. Please call if you have any questions regarding <br /> ft this work plan. }` <br /> Sincerely, <br /> t Applied GeoSystems, Inc. <br /> tOPLE ��� RFSNA Indust" <br /> Eloise K. Frick <br /> No.4333 Pr 'ect Geologist <br /> F 1 Y '� <br /> Of CAl114��\P <br /> l hn B. Bobbitt <br /> , <br /> R.G. 4313 <br /> Attachments: Site V icuuty Map, Plate P-1 <br /> Generalized Site Plan, Plate P <br /> Field Methods <br /> 3 <br /> { <br /> App/led GeoSystems <br />