My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
303
>
3500 - Local Oversight Program
>
PR0544480
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:06:16 PM
Creation date
5/20/2019 2:59:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544480
PE
3528
FACILITY_ID
FA0004960
FACILITY_NAME
CHEROKEE SERVICE CENTER
STREET_NUMBER
303
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04735308
CURRENT_STATUS
02
SITE_LOCATION
303 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> TABLE B-1 <br /> EMERGENCY INFORMATION <br /> Lodi Memorial Hospital <br /> L 975 South Fairmont Avenue <br /> Lodi, California 95240 <br /> (209) 334-3411 <br /> LPolice / Fire / Ambulance - 911 <br /> The Twining Laboratories. Inc. <br /> L1. Kevin Clutter.......(209) 545-1050 <br /> 2. Clay Rodgers....... (209) 268-7021 <br /> 3. Harry Moore........ (209) 268-7021 <br /> B-2 Personal Protective Equipment: It is anticipated that the level of personal protection <br /> required for this project will be U.S. EPA Level D or modified Level C. Personal protective <br /> equipment for each member of the field team will be available on-site and used as may be <br /> required by field conditions. A summary of the personal protective equipment is as follows: <br /> `, • Full or half face respirators equipped with organic vapor cartridges; <br /> LTyvek® coveralls; <br /> • Neoprene rubber gloves; <br /> L • Steel-toed leather work boots or steel-toed rubber boots; <br /> L • Safety glasses; and <br /> • Hard hats. <br /> LHard hats will be worn at all times. Goggles will be worn during steam cleaning operations. <br /> If required,the remaining personal protective equipment shall be put on before entering the <br /> L immediate work area. The sleeves of the coveralls shall be outside of the cuffs of the gloves <br /> to facilitate removal of clothing. If at any time protective clothing(coverall,boots or gloves) <br /> becomes torn, wet, or excessively soiled, they will be replaced immediately. <br /> LNo eating, drinking or smoking will be allowed in the vicinity of the drilling operations. The <br /> project geologist will designate a separate area on-site for eating and drinking. Smoking will <br /> not be allowed at the facility except in designated areas. No contact lenses will be worn by <br /> field personnel. <br /> L <br /> L <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.