Laserfiche WebLink
L f <br /> v <br /> LB-3 Cleanup/Decontamination Procedures: At the end of the workday, the following <br /> procedures will be used to allow for the safe removal and decontamination of personal <br /> Lprotective equipment that may have been required. <br /> • Boots and gloves will be washed with a Alconox® detergent and tap water, then <br /> rinsed before removal. <br /> • Boot covers and coveralls will be removed and coveralls placed in a plastic bag for <br /> appropriate disposal. <br /> • Gloves will then be removed and placed in the plastic bag; hands will be washed with <br /> Lsoap and water. <br /> • Spent protective clothing will be stored on-site in 55-gallon drums and properly <br /> Ldisposed of after receipt of laboratory analyses. <br /> B4 Person Responsible for Health and Safety at Site: Twining's project geologist will be <br /> Lthe designated site safety officer. His responsibilities will include implementation of the site <br /> safety work plan for Twining personnel involved with the field operations. <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br />