Laserfiche WebLink
e . Temporary Fence: A temporary fence will be placed around the ex- <br /> cavation and will remain in place until it is backfilled. <br /> 9 . sackfill: Backfilling will be done by Jim Thorpe Oil personnel . <br /> Backfill material will be whichever is appropriate for the desired <br /> final condition. <br /> 14. work Scheduler Work can begin within 14 days of SJPHS/EHD <br /> approval of this work plan and Mr Largins funding becoming avail- <br /> able. Sample analys®s results should be ready for review within 2 <br /> weeks . <br /> 11. Health and Safety/ Plan: Attached. <br /> Respectfully submitted, <br /> JIM THORPE OIL, INC. <br /> dba RICH-MART CONSTRUCTION <br /> Richard Thorpe <br /> President <br /> L <br /> 3 <br />