Laserfiche WebLink
lie , 12 February 2002 <br /> AGE-NC Project No 97-0312 <br />' Page 5 of 18 , <br /> h <br /> feasibility test, Install an'extraction well for a ground water extraction feasibility test and install six <br /> ozone sparge points and an ozone generating system for an ozone sparge,feasibility test <br /> The proposed scope of work includes ' h a' <br /> • Permitting and pre-field work activities, <br /> • Well abandonment, <br /> • Boring advancement, <br /> • Soil sample collection and analysis, <br /> • Well installation and development, <br /> • Ground water sample collection and analysis, r <br /> • Ground water extraction feasibility testing, <br /> 0 SVE feasibility testing, <br /> • • Ozone feasibilty testing, <br /> o Soil excavation and disposal feasibility assessment, and <br /> O Report preparation <br />' 3 1 PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> r <br /> Prior to conducting field activities, applicable site assessment permits will be obtained from the <br /> EHD In addition,an updated,site-specific health and safety plan will be prepared in accordance with <br /> Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (National <br /> Institute for Occupational Safety and Health Administration, U S Coast Guard and U S' <br /> Environmental Protection Agency, 1985) Prior to'mobilization, the proposed excavation area and 4 <br /> soil boring location will be clearly marked and an underground utility clearance will be�obtained <br /> through,Underground Service Alert <br /> h ' <br /> f � <br /> 3 2 MONITORING WELL ABANDONMENT <br /> Monitoring well UST-1 will be abandoned by aver-drilling the well to total depth(102 feet bsg)and <br /> backfilling to surface grade using portland cement The,procedures for well abandonment are <br /> • presented in Section 4 1 The location of UST-1 is shown on Figure 2 <br /> , <br />' Advanced GeoEnvironmental,Inc <br /> L <br />