Laserfiche WebLink
t <br /> j <br /> PROFESSIONAL SERVICE INDUSTRIES, INC. <br /> SITE SAFETY AND HEALTH PLAN <br /> 1 1.0 INTRODUCTION - This Safety and Health Plan (SHP) is repared <br /> to provide informationp <br /> for worker safety and emergency Procedures on the specific <br /> named <br /> and described below. <br /> The SHP as prepared is not intended as a stand-alone document but will augment the <br />�i Professional Service Industries' Employer's Safety and Health Plan (ESHP), and serve as <br /> Appendix A of that document. A copy of the ESHP and prepared SHP must be made <br />{ available to all personnel working under the conditions of the SHP, and must be reviewed <br /> jwith all personnel, including subcontractors. Following review, all personnel will sign the <br /> Acknowledgment of Training page indicating that they have read and understood the <br /> requirements of the SHP. <br /> 2.0 ORGANIZATION: ' <br /> SHP Prepared By: istine Gunther Date; February 15, 1996 <br /> 1. <br /> r Approved By: � "� Date: _ �y_ 7G <br /> Site Supervis : Christine Gunther <br /> ' Address: 2280 Bates Avenue, Suite D Tel: 510/685-2488 <br /> Concord, CA 94520 <br /> PSI Project Manager: David Bean Tel:209/261-0444 <br /> 3.0 SITE DESCRIPTION: <br /> Site Name: Suburban Propane PSI Project No:582-5I009 <br /> I Location: 23901 S. Chrisman Road, Tracy,CA <br /> kW Site Contact:Jim Gillis, Suburban Propane Tel: 209/835-2115 <br /> Address: 23901 S.Chrisman Road,Tracy,CA 95376 <br /> Site Characteristics (Use,terrain, buildings, etc.): The site is'la propane fuel distribution <br /> yard. A building is present on-site for customer service, and propane tank and truck <br /> maintenance. The outside area to be drilled is asphalt paved'!!three borings will be drilled <br /> here. The building is set on a six-inch concrete slab that is at'grade; one boring will be <br /> drilled inside. Terrain is flat. <br /> L,i <br />