Laserfiche WebLink
Site Safety and Health Plan <br /> Page 2 <br /> f <br /> ' 4.0 TASK ANALYSIS: <br /> Proposed date(s) of PSI Work: February 20-28, 1996 } <br /> General Description of Work to be Accomplished: 1) Drill through asphalt/concrete and <br /> �i excavate four.eight-inch diameter soil borings to a depth of 20 feet; 2) Collect soil samples <br /> { <br /> at 5' intervals and screen the soil using a photoionization detector(PID);. 3) Convert three <br /> of the four soil borings into monitoring wells and grout the fouth boring to the finished <br /> surface; 4)Develop the monitoring wells; 5)Purge and sample the monitoring wells,then <br /> cap them with locking well caps for possible subsequent sampling. NOTE: Equipment <br /> decontamination required in Tasks 1-5. <br /> Ta • Excavate borings <br /> Hazard Risk: Unknown High Moderate X Low <br /> Level of Protection: A B C s X D <br /> Task#2: Collect soil samples <br /> Hazard Risk: Unknown High Moderate X Low <br /> Level of Protection: A B C X D <br /> Task#3: Install monitoring wells. <br /> Hazard Risk: Unknown High Moderate X Low <br /> ;r <br /> 1 <br /> Level of Protection: A B C X D <br /> Task#4: Develop monitoring wells <br /> Hazard Risk: Unknown High Moderate. X. Low <br /> J Level of Protection: A B C 1 X D <br /> Task # • Sample monitoring wells <br /> Hazard Risk: Unknown High r Moderate X Low <br /> Level of Protection: A B C X D <br /> I <br /> �r <br />