My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:42:43 AM
Creation date
5/29/2019 11:07:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT BY:9163622318-Sacra. , CA ; 4-17- 0 ; 1:33PM :RADIAN INTERNATIONAL- 2094683433;# 3/ 9 <br /> DDJC-Tracy MOOS Abandonment Work Plan <br /> 1.3.2 Additional information on the well,the and comparison with extraction well <br /> pump,and its components were gathered to construction diagram details,the well will be <br /> determine the best possible approach to abandon abandoned using pressure grouting techniques. <br /> the well.In Section 2.0 of this work plan,the Well abandonment by pressure grouting will <br /> approach to abandoning EW005AU is discussed include the following: <br /> in detail.Also,removal of the pump and. <br /> components still present in the well is included • Coordination with SJCEHD to obtain well <br /> in the abandonment procedures. destruction permit approval,and notification <br /> of SCJJ3HD of the abandonment schedule; <br /> 2.0 PLANNED FIELD WORK <br /> SUMMARY • Pressure grouting the well from the bottom <br /> of the well to the ground surface using a <br /> 2.1 Pump and Sediment Removal tremie pipe;the well sealant material will <br /> consist of a cement/bentonite grout mixture <br /> 2.1.1 Prior to initiation of any EW005AU in accordance with California Well <br /> abandonment activities,an attempt will be made Standards-Bulletin 74-90(California <br /> to remove the pump and its components from Department of Water Resources, 1991);and <br /> the extraction well.The pump removal activities <br /> will include the following: • Removal of surface protective casing to a <br /> depth of 5 feet bgs and restoration to <br /> • Review of well construction and pump surrounding conditions. <br /> records; <br /> 2.2.2 Field activities will be perforated using <br /> • Coordination with San Joaquin County procedures described in the Comprehensive <br /> Environmental Health Division(SJCEHD) Field Work Plan. Examples of activities include <br /> on date of attempted pump removal; (with Comprehensive Field Work Plan section <br /> numbers): <br /> • Attempts to remove pump by pulling drop <br /> pipe and wiring from the well with various • Regulatory Issues and Permits(8.1); <br /> downhole retrieval tools,as needed;and <br /> • Initial Abandonment Activities,Grout <br /> • if pump is removed,sounding the extraction Composition/Placement(8.3/5.4/8.5); and <br /> well to verify there are no other obstructions <br /> above the bottom of the casing. • Decontamination(9.3). <br /> 2.1.2 if after pump removal,there is more 2.3 Well Abandonment by <br /> than 5 feet of silt in the bottom of the well,the Overdrilling <br /> well will be surged and bailed in an attempt to <br /> remove sediments in the well.If surging the well 2.3.1 If EW005AU pump removal efforts are <br /> to remove sediment is unsuccessful,the well unsuccessful,or the well screen is damaged,the <br /> will then be abandoned by overdrilling the entire well will be abandoned by overdrilling in <br /> well casing,as described in Section 2.3. compliance with requirements established by the <br /> California Well Standards-Bulletin 74-90 and <br /> 2.2 Well Abandonment by abandonment procedures described in the <br /> Pressure Grouting Comprehensive Field Work Plan, <br /> 2.2.1 If the pump removal effort is successful, 2.3.2 Well abandonment activities by <br /> and the total depth of the extraction well is overdrilling will include the following: <br /> verified through sounding of the well bottom <br /> EW00s_Abandonmcnt 2 December 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.