Laserfiche WebLink
• 0 <br /> 4. Place second lift of grout from 350 feet bgs to ground surface using a grout mixture <br /> of Matrix® cement with 3/4 to 1% CFR-3 (as a friction reducer) and 2 to 3% <br /> Calcium Chloride(as an accelerator)by weight. This mixture will allow the cement <br /> to flow into the low permeability formation wherever possible and form a tight seal. <br /> Grout should be placed using the pressure guidelines provided in the Draft Final <br /> Well Abandonment Work Plan, unless excessive loss of grout in the formation is <br /> observed. <br /> 5. The water displaced from AG-3 during well abandonment will be collected using a <br /> vacuum truck and discharged to the lined ponds on the depot. <br /> 6. Remove surface completion as described in the Draft Final Well Abandonment <br /> Work Plan. <br /> page 3 of 3 <br />