Laserfiche WebLink
Mr. Marshall Cloud <br /> April 18, 2008 <br /> Page 2 <br /> 1) Nomenclature; The title of the work plan identifies "Warehouse 10" consistent <br /> with the header on each page, but is inconsistent with the text and Figure 1-1 <br /> both identifying "Building 10." The work plan should present a consistent use of <br /> the nomenclature. <br /> 2) Page 1-1, Section 1.1.3, last sentence; The work plan text should identify that the <br /> reason LM093AU has not been sampled since 3Q98 is that the well was <br /> decommissioned in 1999. The work plan should identify the current status of the <br /> ground water monitoring well LM093AU. <br /> 3) Page 1-2, Section 1.1.5, third sentence; The section should identify the planned <br /> turnaround times (TATs) for the "accelerated process." <br /> 4) Figure 1-1; LM093AU is a decommissioned monitoring well and should be <br /> depicted as "Former Monitoring Well Location" in the figure's Legend along with <br /> its own icon. <br /> 5) Page 2-1, Section 2.0.3, first sentence; The relevant and applicable SWMU 20 <br /> and SWMU 33 investigations should be included an appendix to this Work Plan <br /> to assist in the regulatory reviews but also documentation for the administrative <br /> record. <br /> 6.) Page 2-2, Section 2.1.1, last sentence; See comment #3. <br /> 7) Page 2-2, Section 2.1.3, last sentence; The work plan should indicate whether <br /> the ground water samples will undergo the same 24-hour or 48-hour TAT if the <br /> soil vapor or soil samples indicate the presence of Volatile Organic Compounds <br /> or Total Petroleum Hydrocarbons. <br /> 8) Page 3-2, Table 3-1, Building 10 Sampling Design, fourth bullet; The Section <br /> states that no more than 42 soil vapor samples will be collected, excluding QC <br /> samples. The proposed number contradicts Table 2-1 which states that 45 soil <br /> vapor samples will be collected, excluding quality control samples. The work <br /> plan should correct the discrepancy in the number of soil vapor samples planned <br /> for collection, excluding quality control samples. <br /> 9) Page 3-3, Table 3-1, second bullet; See comment #7. <br /> 10) Page 3-4, Section 3.1.2.4, second to last sentence; See comment #8. <br />