Laserfiche WebLink
Mr. Marshall Cloud <br /> August 12, 2005 <br /> Page 2 <br /> 4) Plate 2, DDJC-Tracy Response Completion Road Map; Similar to comment #3, <br /> please update the status of the Natural Attenuation work plan for dieldrin ground <br /> water for the northwest corner of the depot. <br /> 5) Section 10, FYR Site Inspection Checklist, page D-11; Please remove the circle <br /> around Investigative Clusters/"ICs are adequate" and circle "IC are inadequate," <br /> since the checklist and regulatory inspection identifies two missing signs. The <br /> missing signs are considered one component of the response action, in this case <br /> Institutional Controls (ICs), and prevent the remedy from being fully protective as <br /> intended. <br /> 6) DSERTS 67, FYR Site Inspection Checklist, pages D-12/13, #8; Please amend <br /> part VII "Land Fill Covers" to "Cover(s)" for this site and DSERTS 72. The IC <br /> sections of the checklist do not provide any descriptors to accurately evaluate the <br /> condition of the remedy. Section 8 of the checklist has descriptions for "Ponding" <br /> and "Wet Areas," but no information is filled out. According to the date the <br /> checklist was filled out on March 2, 2005 and the corresponding site photograph <br /> at the front of the checklist, there is clear evidence of standing water creating a <br /> wet area. Please amend the checklist to be consistent with the photographic <br /> documentation provided. <br /> 7) Page 5-8, section 5.5.2, last sentence; This sentence mentions that the western <br /> dieldrin plume will be investigated but does not mention when the investigation <br /> will take place. Since a work plan has been submitted to and reviewed by <br /> regulatory agencies, please insert the anticipated date fieldwork will commence. <br /> In addition, there is no mention of the Trichloroethene, Tetracholorethene or <br /> dieldrin plumes being offsite and should be discussed in this section. <br /> 8) Page 5-6, section 5.3.2, third sentence; Please indicate, in the report, when the <br /> Operations and Maintenance Manual will be updated to include the Granular <br /> Activated Carbon vessel changeover and the submittal date to the regulatory <br /> agencies for review. <br /> 9) Section 15, Five-Year Review Checklist, page D-10, part B; During the FYR <br /> inspections conducted on March 2, 2005, it was noted that one of the signs was <br /> knocked down and wasn't providing the protectiveness as intended in the Record <br /> of Decision. Please amend this section to reflect the deficiency in the selected <br /> remedy. DTSC recommends correcting this deficiency when repair efforts are <br /> mobilized to replace the missing signs at SWMU 7 and DSERTS 72. <br />