Laserfiche WebLink
merited at many sites. However,fe the plume is F. OPTIMIZVION AND CONTINUOUS <br /> found to be relatively stable, sampling semi-annually, IMPROVEMENT <br /> annually, or at some other frequency may be merited, <br /> and the number of sampling locations and/or <br /> parameters may also be reduced. Provisions in the Continuous improvement can occur by periodically <br /> contract should exist to reduce the sampling scope of evaluating goals, performance, and cost-effectiveness <br /> work accordingly. and then implementing changes from these <br /> evaluations. <br /> Reductions in materials and labor: If a metals removal <br /> system or another treatment component is no longer Periodic third-party(or independent)reviews of a <br /> necessary because influent concentrations meet P&T system that include a review of site documents <br /> discharge requirements, that system should be removed and discussions with the site stakeholders are <br /> and the associated labor eliminated. recommended. These reviews,when performed.by a <br /> team of experts, can provide the following benefits: <br /> Example 5 <br /> • an unbiased, external review of system <br /> Lump sum versus cost reimbursable operation and costs <br /> Hypothetical P&T System expertise in hydrogeology and engineering <br /> • system addresses polyaromatic hydrocarbons(PAHs) <br /> from a former wood treating facility. <br /> • extracted water is pumped through an oil/water specific knowledge and experience with new <br /> separator and then through large GAC units. or alternative technologies <br /> • replacement of GAC units occurs twice every year and <br /> costs $20,000 per replacement. experience gained from designing, operating, <br /> • electricity rates have varied from$0.05 to$0.10 per or reviewing other systems <br /> kWh over the past 5 years. On average 20,000 kWh <br /> are used per month(240,000 kWh per year). a fresh perspective on the problems at hand <br /> Contracting option 1:lump sum and the current remedy <br /> Contractor bids$750,000 lump sum for 3 years of O&M <br /> assuming six potential GAC replacements($120,000),a System improvement, however, will only occur if <br /> possible electrical rate of$0.12 per kWh($28,800 per recommendations are implemented. <br /> year)to account for uncertainly,and$50,000 for non- <br /> routine maintenance G. CITED RESOURCES <br /> Contracting option 2:combined lump sum/cost ......••• <br /> reimbursable <br /> Contractor receives$495,000 lump sum for labor, U.S. Anny Cotes of Engineers, Engineer Pamphlet <br /> reporting,sampling and analysis for 3 years of O&M. To 1110-1-27. Available at http://www.usace.anny.mil <br /> remove uncertainty from the lump sum bid,the site owner <br /> pays for GAC replacements,electrical usage,and non- NOTICE: <br /> routine maintenance as required(cost reimbursable). <br /> This document was prepared by GeoTrans,Inc. for U.S. <br /> Scenario: EPA under Dynamac Contract No. 68-C-99-256, <br /> During 3 years of O&M, improved filtration and Subcontract No. 91517,Task AD02-105. Mention of trade <br /> decreasing concentrations reduce frequency of GAC names or commercial products does not constitute <br /> replacement to once per year(3 total),electrical rates are endorsement or recommendation for use. <br /> approximately$0.06 per kWh,and$25,000 of non- This document may be downloaded from EPA's Clean Up <br /> routine maintenance is required. Information(CLUIN)System at http://www.clu-in.org. <br /> Costs for contract 1: $750,000 Hard copy versions are available free of charge from the <br /> Costs for contract 2: $623,200 National Service Center for Environmental Publications <br /> Difference: $126,800 (NSCEP)at the following address: <br /> U.S. EPA NSCEP <br /> Lesson: Lump sum is more effective for items that are P.O. Box 42419 <br /> highly predictable, and cost reimbursable is more Cincinnati,OH 45242-2419 <br /> effective for items that are uncertain. Phone: (800)490-9198 or(513)489-8190 <br /> Fax: (513)489-8695 <br /> 18 <br />