Laserfiche WebLink
regulatory agency comments on the Revised Draft Final RAR(including comments on the <br /> SWMU 6 Technical Memorandum) in the Final version of the RAR. <br /> It is not clear from the Revised Draft Final RAR if groundwater monitoring will continue <br /> at S WNW 6, as requested by regulatory agencies in their comments on the Draft RAR and <br /> previously stated in the Draft Final RAR("Groundwater monitoring at SWMU 6 should continue <br /> until it can be demonstrated that the Record of Decision(ROD)requirements have been met.") <br /> Since residual contamination remains above ROD-specified cleanup standards at SWMU 6, <br /> groundwater monitoring should continue. Although it appears from the general sections <br /> describing post-construction activities that monitoring will continue, the Draft Final RAR <br /> recommendation of continued monitoring was deleted from the sections specific to SWMU 6 in <br /> the Revised Draft Final. Please restore the text to all appropriate site-specific sections for <br /> SWMU 6 (e.g., Executive Summary; Section 6.1)to include the recommendation for continued <br /> groundwater monitoring for herbicides and pesticides. <br /> Please feel free to contact me at 415-972-3024 if you have any questions or comments. <br /> Sincerely, n <br /> A411'c 6 <br /> Michael Work <br /> Federal Facility and Site Cleanup Branch <br /> Superfund Division(SFD-8-3) <br /> cc: (See Distribution List) <br /> 2 <br />