Laserfiche WebLink
i <br /> Aeration GAC air <br /> toa,ar Iiror <br /> P*,:wng Olacnarge <br /> matanal Purnpa <br /> o — <br /> Clean wean out� <br /> E:aacdan well Infection well <br /> Water level <br /> i Contaminated ground wafer Uncontaminated <br /> groundwater <br /> INTERIM REMEDIAL MEASURE and EPA have evaluated four alternatives for <br /> groundwater cleanup at DDRW-Tracy. These four <br /> Phase I of the Interim Remedial Measure alternatives are discussed below. <br /> (IRM) has been constructed at the northeastern <br /> boundary of DDRW-Tracy. The objective of the TCE and PCE are the target chemicals of <br /> IRM is to reduce additional contamination from concern to be cleaned up. Other volatile organics <br /> migrating off depot. The IRM is a groundwater such as 1,1-dichloroethene, carbon tetrachloride, <br /> extraction and treatment system designed to collect and chloroform will be cleaned up along with the <br /> groundwater from the upper horizon of the con- TCE and PCE. Inorganics, such as boron and <br /> taminated aquifer (about 50-foot depth), treat the nitrate,found at elevated concentrations in the OU <br /> water by air stripping, treat volatile organic air #1 plume, and pesticides,such as dieldrin, are not <br /> emissions using a vapor-phase granular activated believed to have on-base sources.However,ground- <br /> carbon control unit, and dispose of the treated water extracted for treatment may have to be pre- <br /> groundwater by shallow well injection. treated for one or more of these compounds, if <br /> present in sufficiently high concentrations,to pre- <br /> At present,in the first phase of operation,the vent damage to the treatment system and impacts <br /> air stripping system operates at about 120 gallons on the reinjection aquifer groundwater quality. <br /> per minute(gpm)using an air stripper designed to <br /> treat 500 gpm,six extraction wells,three injection Alternative 1, termed "no-action," consists <br /> wells, and ten monitoring wells. of no physical cleanup, but monitors the ground- <br /> water plume using about 30 existing on-base and <br /> SUMMARY OF REMEDIATION off-base monitoring wells. Consideration of the <br /> ALTERNATIVES "no action"remedial alternative is required by the <br /> National Oil and Hazardous Substances Pollution <br /> The OU #1 groundwater FS for DDRW- Contingency Plan (NCP). It also serves as a <br /> Tracy was presented to EPA in October 1992. reference for comparison of the cost and non-cost <br /> DDRW-Tracy,the Central Valley Regional Water characteristics of the other remedial alternatives. <br /> Quality Control Board (RWQCB), California's This alternative would be implemented for 30 <br /> Department of Toxic Substances Control(DTSC), years. The estimated costs are shown below: <br /> 5 <br />