0 • <br /> Monitoring Costs $1,734,000 implemented for 30 years. The estimated costs <br /> Capital Costs 0 for the 30-year period are: <br /> Total Operations and Maintenance 0 <br /> (O&M) Costs Monitoring Costs $1,734,000 <br /> Present Worth Cost for 30 years Capital Costs $3,324,000 <br /> $1,734,000 Total O&M Costs $285,000 <br /> 5-year Performance Evaluation <br /> "Present-worth cost"is the amount of money $70,000 <br /> that,if invested now,would cover all the estimated (performed at end of years 5, 10, <br /> costs of the proposed alternative. 15, 20, 25, and 30) <br /> Present Worth Costs for 30 years <br /> Alternative 2,termed"Institutional Controls," $9,513,000 <br /> consists of no physical cleanup but prohibits the <br /> drilling of off-base shallow wells downgradient of Alternative 4 is groundwater extraction at <br /> DDRW-Tracy in the area presently affected by the 1000 gpm with treatment by air stripping and <br /> contaminant plume or potentially affected in the vapor-phase carbon with in situ biological treat- <br /> future,imposes deed restrictions on future residen- ment and injection into the aquifer. This is a novel <br /> tial development adjacent to the site downgradient, approach to treat the extracted groundwater by air <br /> requires a signed Interagency Management Agree- stripping,as in Alternative 3,then adding nutrients <br /> ment to control future groundwater use at the site, to a small portion of the treated water as it is <br /> and requires DDRW-Tracy to provide bottled wa- injected into the underground aquifer. These nutri- <br /> ter to two families. As with Alternative 1, the ents will cause TCE, PCE, and other organic <br /> groundwater plume would be monitored using 30 contaminants that are underground to break down <br /> wells. This alternative would also be implemented into nontoxic compounds. <br /> for 30 years. The estimated costs are shown below: <br /> Alternative 4 uses the same number of extrac- <br /> Monitoring Costs $1,734,000 tion wells and air strippers as Alternative 3. An <br /> Bottled Water Costs $14,000 additional four wells to inject the nutrient-rich <br /> Capital Costs 0 treated water have been added to make a total of <br /> Total O&M Costs 0 about 38 injection wells. Pilot testing would be <br /> Present Worth Cost for 30 years needed to demonstrate the effectiveness of this <br /> $1,748,000 alternative. A similar cleanup strategy has been <br /> accepted at another Superfund site. This alterna- <br /> Alternative 3(preferred)is groundwater ex- five would include monitoring of the groundwater <br /> traction at 1000gpmwith treatment by air stripping and would be implemented for 30 years. The <br /> and vapor-phase carbon and injection into the estimated costs for the 30-year period are: <br /> aquifer, and is designed to capture and remediate <br /> the entire OU#1 on-base and off-base contaminant Pilot Tests Cost $200,000 <br /> plume. This alternative would use the current IRM Monitoring Costs $1,734,000 <br /> air stripping system plus one additional similar air Capital Costs $3,869,000 <br /> stripping system to handle up to 1000 gpm of Total O&M Costs $366,000 <br /> extracted groundwater. Groundwater would be 5-year Performance Evaluation <br /> extracted using about 41 extraction wells, treated $84,000 <br /> by the two air strippers, and injected back into the (performed at end of years 5, 10, <br /> upper and middle horizons of the aquifer using 15, 20, 25, and 30) <br /> about 34 injection wells. This alternative includes Present Worth Cost for 30 years <br /> monitoring of the groundwater and would be $11,313,000 <br /> 6 <br />