Laserfiche WebLink
Completed on Underground Storage Disk <br /> Code: A:CP1an.Doc (Using Zenith 248 PC)_ <br /> EXCAVATION h1ETHt7DOL6GY <br /> (BUILDING 247 WAREHOUSE 28) <br /> The following methodology for the control of excavated soil at <br /> Building 247 and Warehouse 28 Is considered acceptable since <br /> excaestion operations will be accomplished during the summer <br /> months . <br /> i . All excavated soil will be placed on tarpaulin/plastic a <br /> sufficient distance away from the banks of the trench to avoid <br /> i slides or cava- ins. <br /> 2. The excavated soil Witt be covered with tarpautinlplastic and <br /> Weighted to prevent the soil from becoming airborne . <br /> S . If the soil tests reveal contamination, soil will be drummed <br /> into Governmen- furnished container_ and disposed of by the <br /> Defense Reutilizstion and Marketing Services . <br /> 4 . If soil tests verify M contamination, soil w1 I) be <br /> commingled with new tackfiil material and placed back into the <br /> exsvaLed nr_e . <br /> 5. Nlcl back i l l or disposal shalt be accomplished until written <br /> suthcrization has been received from thrz. Californle Department of <br /> .Health Services. <br /> i <br /> i <br /> i <br /> v <br /> i - <br />