My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D:.6005-86-B-0008 <br /> PAGE 10 OF 69 <br /> SECTION <br /> TYDOLITION, E ANIATMN ANT TOP FINISH <br /> 2-01. GOALDJ <br /> AUIRr^. SIS: The :conic includes demoliticn, disposition, <br /> smsnting nae excavation as spec fi_ed herein and as indicated in the <br /> Facilities Engineer drawing No. 23.34. <br /> 2-02. TITLE TD PROP :Ti: L'niess otr2nai-se specified or indicated, excavated <br /> tants ane eeciisL ed/dismantled materials and equiprent shall become tre <br /> property of the Contractor. Preceding materials/equiprent shall be <br /> hauled off the Depot by the Contractor. <br /> 2-02.1 Tank Contents: Thi Contractor, prior to the excavation of <br /> tames,s p p into containers the contents of each partially <br /> filled tank as shown on the construction drawing. The . <br /> Contractor shall provide pumping equipment and the Government <br /> shall provide t'ne containers. Pining equipment shall be <br /> sparklers. The Contractor shall provide grounding conductors <br /> and grc,^d cortr_iner before p=?ing. Filled containers shall be <br /> delivered to Bldg. 237 by the Contractor. <br /> 2-03. PROTECTION OF P1 S0^:S Ai M' Y\CPFRTY: shall be provided throughout the <br /> progress of trig work. Tea 1mrk snarl proceed in such a manner as to <br /> min -ize the spread of dust and flying particles and to provide safe <br /> working conditions for personnel. - <br /> 2-03.1 Gui d rails, fences, or ctl Zr ba --icades and warring lights or <br /> other i rumination maintained from sunset to sunup, shall be <br /> placed at all excavation sites. Adequate barrier physical <br /> protection shall b_ provided at all remotely located <br /> excavation. All wells, holes, trenches and pits shall be <br /> covered with 1" thick plyboard if not L-mradiately backfilled up <br /> to 12" from sur-rcundi.ng grade. <br /> 2-03.2 Diversion ditchers, di k2.s, or other suitable means sha.11 be used <br /> to pre%=eat surface tinter entering an excavation and to provide <br /> good drainz,ge of the area adjacent to ttie excavation. <br /> 2-03.3 Bracing, shoring, crib in-i.., and othzr suIDports shall be provided <br /> wnere pe!:so:-- ei ure requir d to enter excavation over 4 feet <br /> deep. <br /> 2-0+. H:-IDLITIM: Bld`. 203, including concrete foundation shall be <br /> ae :zsree ecnml,^:rely. E--<plosivcs :.ill not ba used in fr.- <br /> de lition <br /> hedemolition process. <br /> 2-05. Fi; W.YlION: All c:cavation of uvcry d scripticn shall be performed to <br /> the eepths indicated on the const^.action drawing. During excavation, <br /> material suitable (:as det-rained by th-- Co:aracting Officer) for <br /> 2-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.