Laserfiche WebLink
DLA005-86-B-0008 <br /> PAGE 11 OF 69 <br /> backfill shall be piled in an orderly manner a sufficient distance from <br /> the banks of the trench to avoid overload' and to prevent slides or <br /> � <br /> cave-Lis. All excavated asphalt/ concrete tops and concrete foumdaticns <br /> shall be hauled off the Depot by the Contractor. Lnless othen- gise <br /> indicated, excavation shall be started by open cut. 1-k ere gravel finish <br /> surface etist, gravels shall be scraped off to earth grade and piled in <br /> - an area designated by the Contracting Cfficer prior to excavation. <br /> Preceding gravel shall be used by the Contractor as surface finish after <br /> backfill. Gravel surface sites are lose 30 and north of Bldg. 203. <br /> 2-06. Be'Lf.FILLING: Backfilling shall not begin until authorized in writing by <br /> The San Joaquin County Local Health District. Authorization shall be <br /> obtained by the Contractor. The preceding shall be followed only if <br /> there is soil contamination. If there is no soil contamination, autho- <br /> sization to backfill shall come from the Contracting Officer. , <br /> 2-06.1 Backfill '-%terials: Satisfactory material as determined by th:. <br /> Contracting Otrics-, shall bre used in fills. Satisfactory <br /> material shall be free from roots, other organic matter, trash, <br /> debris and stones is-ger than 3 inches in any dimension, with <br /> not greater than 35 percent fines, a liquid limit not to exceed 35 <br /> and a plasticity index not exceeding 12. Excavated suitable <br /> material for backfill shall be used last. . <br /> 2-06.2 Preoaraticn of Ground Surfaces: Unsatisfactory material (as <br /> creme= reo oy the Contracting Officer) in surfaces to receive <br /> fill shall be removed. The surface shall be scarified to a <br /> depth of 6 inches before fill is started. When subc�7ades are of <br /> less than 95 percent density; the ground surface shall be bmik_n <br /> un, pulverized, and ccmpected to the specified density. <br /> 2-06.3 Placing: Backfill material shall be placed in horizontal layers <br /> not e:•:ceedirg 8 inches in loose depth and then compacted. No <br /> Mterirl shall be placed on surfaces that are muddy. <br /> 2-06.4 C=action shall be performed by rolling with approved tamping <br /> roiiers, or other ecraipment approved by the Contracting Officer <br /> suited to t1n soil being compacted. Material sha-11 be moistened <br /> or aerated as necessary to provide the moisture content that <br /> will readily facilitate obtaining the specified compaction with <br /> the egr_pment used. Each layer shall be compacted to not less <br /> than 95 percent. <br /> 2-07. ASPHA:.TIC 0.7\CRE7r-: This ti:ork shall consist of furnishing and mixing <br /> aggregate and asuhalt birdcr at a central mixing plant, and spreading <br /> and cczpacting fne r.:i==e. <br /> 2-02 <br />