Laserfiche WebLink
September 30,2015 Monitoring V fell Abandonment and <br /> Installation Workplan <br /> Table <br /> ReplacementConstruction Information for <br /> Screened <br /> Diameter Depth Interval Objective <br /> Well ID Status (inches) (feet bis) <br /> (feet bis) <br /> KMW-10 Proposed 4 31 10-30 LAS-2 monitoring <br /> KMW-11 Proposed 4 31 10-30 LAS-1 monitoring <br /> 1.6. Equipment Decontamination Procedures <br /> On the basis of historic and current land use and existing groundwater monitoring data,no <br /> hazardous constituents are expected at the drilling locations.The folio ing steps therefore <br /> represent the minimum decontamination procedures to be employed. <br /> • All equipment used for constructing the well must be free of cc ntamination and <br /> cleaned to prevent potential cross contamination.Equipment,tools,materials,etc. <br /> will be decontaminated prior to the beginning of the work and prior to the well <br /> installation.For example,all screens and casings used for mon toring wells should <br /> be in a sterile and contaminant-free condition when placed in I he ground. <br /> • Some form of steam cleaning or high-pressure water-spraying technique combined <br /> with a low-suds non-phosphate detergent shall be employed followed by rinsing <br /> with potable water.The rinseate and drill cuttings will be spre id on the ground at <br /> the site.Discharge to stormwater drains or surface water featL res is not acceptable. <br /> 1.7. Health and Safety Plan <br /> No hazardous constituents or contamination are expected at the proje ct site locations,and <br /> all work will be carried out in compliance with Occupational Safety an d Health <br /> Administration (OSHA)regulations and guidelines.All personnel worl qng at the site during <br /> well construction and abandonment activities shall be familiar with tl ese regulations and <br /> guidelines. <br /> The primary physical hazards are associated with the use of the drilling rig and supporting <br /> vehicles.All drillers performing work must possess required C-57 license,and all drill crew <br /> members shall receive site-specific training prior to beginning work. he licensed driller <br /> shall be responsible for the safe operation of the drill rig as well as the crew's adherence to <br /> all safety procedures.The crew members and other personnel at the site shall wear <br /> protective equipment(i.e.,hard hat,gloves,and steel toed boots),and be aware of all <br /> hazards and control procedures.All personnel working at the site sha 1 participate in the <br /> Daily Safety Meetings and be aware of all emergency procedures. <br /> Before drilling,the existence and location of underground pipe, electrical equipment and <br /> gas lines will be determined.Documentation that nearby utilities have been marked on the <br /> ground,and that the drill site has been cleared shall be in the possess on of the Field <br /> Operations Manager prior to commencement of drilling at the site.If rifling is conducted in <br /> HydroFocus, Inc. 4 <br />