Laserfiche WebLink
September 30,2015 Monitoring Well Abandonment and <br /> Installation Workplan <br /> It is anticipated that wells KMW-1 and KMW-3 will be abandoned and,if required,replaced <br /> with new wells KMW-10 and KMW-11 by November 30, 2015 or withi 60 days of RWQCB <br /> approval of this workplan. <br /> Within 90 days of completing any of the construction or abandonment activities,a <br /> Monitoring Well Installation/Abandonment Report shall be submitted o the Regional <br /> Water Quality Control Board.The report shall document well installation and abandonment <br /> activities and include well construction diagrams,boring logs,well development records, <br /> and measuring point elevations. <br /> Additionally,separate monitoring well construction and destruction rE ports will be <br /> prepared and filed with the California Department of Water Resources as required by the <br /> California Water Code. <br /> HydroFocus, Inc. 10 <br />