Laserfiche WebLink
California Regional Water Quality Control Board <br /> Central Valley Region a <br /> Robert Schneider,Chair <br /> Winston H.Hickox Gray Davis <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental - Internet Address: http://w .s b.ca.gov/—mgcb5 <br /> Protection 3443 Render Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> 21 June 2002 <br /> I-DDo <br /> Ramon Batista <br /> City of Lathrop <br /> 16775 Howland Road <br /> Lathrop, CA 95330 <br /> PROPOSED WASTE DISCHAR GE REQUIREMENT SCHED ULE CHANGE, LATHROP, SAN <br /> JOAQUIN COUNTY <br /> I have reviewed the 17 June 2002 City of Lathrop correspondence proposing a due date extension to the <br /> Groundwater Well Installation Report required by Waste Discharge Requirements (WDRs) Provision <br /> F.I.e. The submittal due date is 30 June 2002. Your letter describes the potential use of new land <br /> application areas and requests a delay in well installation at the designated land application areas until <br /> the issue is resolved. If new land application areas are used, a revised monitoring network would be <br /> designed. Wastewater can be applied to new land application areas only after the WDRs are revised. To <br /> revise the WDRs, a complete Report of Waste Discharge (RWD) must be submitted at least 120 days <br /> prior to initiating the discharge. <br /> Your letter does not describe the status of the land application areas described in the WDRs; will they be <br /> used for wastewater application? If so, there is no reason to delay installation of the monitoring wells. <br /> Additional wells for new land application areas can be added to the monitoring network later and would <br /> be addressed in revised WDRs. Failing to meet the schedule for well installation will impact the <br /> schedule of a number of other technical reports including the reports required by Provisions F.l.f and <br /> F.l.g. You request an extension until 30 August 2002; in fact, if new land application areas are <br /> proposed, an RWD will be required delaying the well installation considerably beyond 30 August 2002. <br /> If you have any questions on this information,please telephone me at (916) 255-3116. <br /> TIMOTHY R. O'BRIEN <br /> Waste Discharge to Land Unit <br /> San Joaquin River Watershed <br /> cc: Mike Huggins, San Joaquin County Environmental Health Department, Stockton <br /> Joseph Spano,Department of Health Services, Stockton <br /> California Environmental Protection Agency <br /> ped Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at http://www.swrcb.ca.gov/mgcb5 <br />