Laserfiche WebLink
0 0 <br /> ' River Islands at Lathrop 5044.5.001.01 <br /> Monitoring Wells MW-13, MW-15, MW-18 and MW-20 April 13, 2006 <br /> SUMMARY OF MONITORING WELL REPAIRS Page 2 <br /> At this time, new top of casing and ground surface elevations have not yet been established. To <br /> meet the requirements of the RWQCB, the project land surveyor will need to survey the wells to <br /> ' establish ground surface, top of casing elevations, and horizontal coordinates for each of the four <br /> repaired wells. <br /> ' We are pleased to be of service to you on this project. If you have any questions regarding the <br /> contents of this letter, please do not hesitate to contact us. <br /> ' Very truly yours, <br /> ENGEO INCORPORATED <br /> unP3 can Hickmott ° Zac Crawford <br /> ' dh/vs:summary <br /> ' Attachment: Figure 1 - Site Plan <br /> 1 <br /> 1 <br />