Laserfiche WebLink
Cary Keaten • - 2 - • 10 April 2007 <br /> result in only 10-inch diameter hollow stem auger rigs being acceptable at the site in <br /> future Addendums. Similarly, listing specific survey or engineering companies will limit <br /> ' who can perform the work. <br /> 3. In "Section B. Drilling Details," please address the following items: <br /> ' a. Supervision of Drilling and Well Installation - The need to submit and receive <br /> approval of a Groundwater Well Project Description Addendums (required by <br /> ' WDR Provision G.1.i.ii) is not described. Please add a description of the <br /> Addendum approval process. <br /> b. Drilling Equipment and Techniques - The Drilling Equipment and Techniques in <br /> ' Section B describes use of 10-inch diameter hollow stem auger to drill <br /> groundwater monitoring wells. Specification of the equipment will limit all wells to <br /> use of 10-inch diameter augers. You may wish to describe the drilling techniques <br /> I in more general terms so that 8-inch diameter augers or other drilling techniques <br /> are included in the Master Workplan. <br /> c. Drilling Equipment and Techniques - It is unclear why the boring depth is specified <br /> in the Master Workplan. Because groundwater conditions may vary considerably <br /> across the project area, the depth to groundwater and well construction details <br /> ' should be described in the Addendums. <br /> d. Decontamination Procedures - Despite the assumption that no hazardous <br /> ' materials are anticipated to be encountered, contamination of wells by bacteria or <br /> other waste constituents is an important issue that should be addressed. <br /> e. Soil Sampling and Borehole Logging —The description of the continuous core <br /> ' sampling device will require all borings to be continuously cored for lithologic <br /> sample collection. Continuous coring may not be necessary at every well site. <br /> Revise the workplan as needed. <br /> ' 4. In "Section C. Monitoring Well Design," please address the following items: <br /> a. As described above, statements that determine well construction details such as <br /> depth and screen interval are inappropriate in the Master Workplan. Please <br /> revise the text. <br /> ' b. The concept of constructing wells that are deeper than 24-feet by simply <br /> extending the screen interval is generally not acceptable. Wells should be <br /> constructed based on the location, seal requirements, and interval to be <br /> ' monitored. Please revise the text appropriately. <br /> c. Describing the sand pack as No. 3 sand should be avoided because conditions <br /> ' may not be the same throughout the project area. In addition, the sand pack <br /> should be surged prior to placement of the transition seal (bentonite) if conditions <br /> allow. <br /> ' d. Hydration of the bentonite transition seal is not described. Bentonite pellets <br /> should be hydrated prior to cement seal placement. <br /> e. The concrete described in the wellhead description is not included on Figure 4. In <br /> addition, a detail of a flush mounted wellhead is not presented in the Master <br /> Workplan. Please revise the figure. <br /> W lSuilWbnen'RSu]wquiALUArw WW'lNAH0.6MGOIXa¢nBMu D)d« <br />