Laserfiche WebLink
Mr.James L. Barton P.G. <br /> Central Valley Regional Water Quality Control Board <br /> December 3,2015 <br /> Page 4 <br /> the County. Drilling activities will be scheduled to take place within three weeks of receipt of the <br /> drilling permits.An estimated two days will be required to perform the investigation activities and <br /> an additional two weeks will be required to receive the analytical results from the laboratory <br /> following the end of field operations.Waste disposal will be scheduled pending results of the <br /> IDW samples.A letter report will be prepared after receiving the analytical results from the <br /> laboratory.The draft report will include the field notes, boring logs,analytical results, and <br /> summary and recommendations.The report will be submitted within three weeks following <br /> receipt of the laboratory data. <br /> V <br /> 5Sr» <br /> If you have any questions, please contact Gary Lieberman at(707)793-3858. 44 �9t0 <br /> Sincerely yours, <br /> Amec Foster Wheeler Environment& <br /> los <br /> Infrastructure, Inc. <br /> -17 <br /> ` arE Q CAt«0�� <br /> Gary leberman David Stolcenberg PE <br /> Ass) ' to Geology Professional Senior Engineer <br /> GAUDS(sac <br /> W-fsllpmjeclslsecretarlaMay area-pet ra\nw newark groupknw65098_verd al defln fion work plan.dcor <br /> Enclosures: Figure 1 -Site Location Map <br /> Figure 2-Site and Proposed Boring Location Map <br /> cc. Bill Doer,The Newark Group <br /> Amec Foster Wheeler <br /> I <br />