My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:47:47 PM
Creation date
5/31/2019 3:21:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> Dopaco, Inc. �^ - 2 - 21 October 2013 } <br /> 800 W. Church St., Stockton <br /> San Joaquin County Y r' <br /> In the Report, GC states the investigation conducted`in July and August of 2013 defined the vertical and <br /> lateral extent of toluene in soil and groundwater.,i,However, a deep monitoring well (CPT-13 location) <br /> required by in a Regional Water Board staff letter dated 24 July 2013 is scheduled to be installed after <br /> completion of the soil excavation to verify vertical extent of pollution. t <br /> i <br /> In the Report, GC proposed to complete the soil "excavation work by November 2013, submit an <br /> Excavation Completion Report including a work Plan for installation of a deep well"by January 2014 and ! <br /> complete installation of the deep well at CPT-13 by March 2014. 1 <br /> The proposed schedule is acceptable. Please submit the: <br /> • Work Plan Addendum with the Fact Sheet and revised Health and Safety Plan by <br /> 15 November 2013. <br /> Excavation Completion-Report and deep well work plan by 30 January2014.- _ -- <br /> • Deep well installation report by 30 April 2013. <br /> If you have any questions or concerns you may contact me by phone at (916) 464-4615 or by email at <br /> ibartonCaD-waterboards.ca.aov. <br /> James L. L. Barton, P. G. <br /> Engineering Geologist <br /> UST Program <br /> I <br /> Attachment: Figure .1 <br /> cc: Nuel Henderson, San Joaquin County Environmental Health 'Department, Stockton <br /> Joe Michaud, Newark Paperboard'Mills, 9 Eno Drive, Exeter, NH 03833 1 <br /> David Ascher, The Newark Group,flnc., 20 Jackson Drive, Cranford, NJ 07016 i <br /> I ' <br /> Bill Doerr, The Newark Group, Inc., 310 W. Water St., Baltimore, OH 43105 � <br /> Eddie Tolentino, The Newark Group, Inc., 2575 Grand Canal, Ste. 2000, Stockton 95207 <br /> Mark Poe, Morrison & Foerster LLP, 425 Market St., San Francisco 94105 <br /> Carolyn Kneiblher, Geosyntec Consultants, 1111 Broadway, 6th Floor, Oakland 94607 <br /> Peter Krasnoff, West Environmental Services &Technology, 711 Grand Ave., Ste. 220, <br /> San Rafael 94901 - _ r - r <br /> Vern Elarth, URS Corporation, 100 W. San Fernando Street, San Jose, CA 95331 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.