My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:47:47 PM
Creation date
5/31/2019 3:21:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adrienne Ellsaesser [EH] <br /> From: Tony Smith <TSmith@Geosyntec.com> <br /> Sent: Thursday,July 25, 2013 4:31 PM <br /> To: Adrienne Ellsaesser [EH] <br /> Subject: Boring permit application packet <br /> Attachments: WellPermit4pl_25Ju1y2013.pdf <br /> Adrienne, <br /> Attached is a permit application for CPT/hydropunch borings on Church St and S San Jose St in Stockton. I highlighted <br /> applicable sections of the work plan and marked-up the figure to indicate proposed sampling locations. If approved,this <br /> work will be performed 7/29 and 7/30,and will overlap with the work on permit SR0067624,which will be concluded on <br /> 8/2 (we will only be in the field 3 days next week:7/29,7/30,.and 8/2). <br /> Regarding SR0067624,the water board has recommended that an additional soil gas sampling location be included in <br /> the scope. The permit is currently for 2 soil gas borings installed by direct push to a depth of 5 ft bgs. The third boring <br /> would also be to 5 ft bgs, but because of access limitations,would be completed by hand auger,thus requiring a 48-hour <br /> equilibration time between probe construction and sampling according to DTSC guidance documents. Logistically,we <br /> would have to install the third probe on Monday 7/29 an&would sample on Friday 8/2., <br /> Is it possible to add this third soil gas probe to the previously-issued permit SR0067624?And does the county have any <br /> objection to the third soil gas probe remaining in the ground for four.days? <br /> Thank you for your prompt review. I apologize that this came together at the last minute and I appreciate your help <br /> turning around these permits so quickly. Please contact me if you have any questions. <br /> Tony Smith, Ph.D., P.E. <br /> Senior Staff Engineer <br /> ----------------------------- <br /> Geosyntec Consultants <br /> 1111 Broadway,Ste 600 <br /> Oakland,CA 94607 <br /> Direct:(510)285-2770 4 <br /> tsmith@geosvntec.com <br /> From: John Yoakum [EH] [mailto:]YoakumCabsjcehd.com] <br /> Sent: Monday, July 22, 2013 2:56 PM <br /> To: Anthony Smith <br /> Subject: RE: Boring permit application packet <br /> Tony, <br /> Your permit for 800 W Church Street has been issued.. <br /> The permit number is SR0067624. <br /> I have attached a copy of the permit to this e-mail. s <br /> Your permit is for 5 soil borings. <br /> I have you on my calendar to begin July 29,2013. �. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.